Project Overview
Installation of a lift system with an integrated generator set at a senior government facility in Rawalpindi. The addition of a dedicated generator ensures uninterrupted lift operation during power outages , a critical requirement for a high-priority facility. This project required coordination between lift installation and power systems, completed over a 12-month programme.
Scope of Work
- Supply and installation of lift system at government facility
- Integration of a dedicated generator set for backup power continuity
- Electrical coordination between lift controls and generator systems
- Full load testing, commissioning and handover
Key Highlights
Note: Credentials and specific client details have been intentionally withheld from this project profile in accordance with non-disclosure agreements and applicable terms and conditions.