Government of Pakistan

Project Overview

Installation of a lift system with an integrated generator set at a senior government facility in Rawalpindi. The addition of a dedicated generator ensures uninterrupted lift operation during power outages , a critical requirement for a high-priority facility. This project required coordination between lift installation and power systems, completed over a 12-month programme.

Scope of Work

  • Supply and installation of lift system at government facility
  • Integration of a dedicated generator set for backup power continuity
  • Electrical coordination between lift controls and generator systems
  • Full load testing, commissioning and handover

Key Highlights

Note:  Credentials and specific client details have been intentionally withheld from this project profile in accordance with non-disclosure agreements and applicable terms and conditions.